Operations Maintenance

Standardising Asset Execution, Reliability & Compliance with goPLIMS

Executive Summary
  • O&M teams struggle with fragmented logs, manual workflows, and inconsistent documentation
  • Maintenance relies on Excel trackers, email, paper forms, and disconnected CMMS/LIMS/QA systems
  • Deviations, changes, and decisions lack structured traceability, increasing compliance and reliability risk
  • No unified execution layer connecting operations, maintenance, engineering, QA, and reliability teams
Business Challenge
  • Manual maintenance logs and paper-based inspection forms
  • Slow issue resolution due to unstructured communication
  • Fragmented documentation across CMMS, SharePoint, and local drives
  • Limited visibility into asset health, maintenance backlog, and risk items
  • High compilance burden (GP, safety, environmentat, reliability standards)
The goPLIMS Solution
  • Unified O&M execution platform connecting opera-tions, maintenance, QA, and engineering
  • Digital forms for inspections, PMs, calibrations, and safety checks
  • Structured workflows for deviations, RFls, decisions, and change control
  • Real-time dashboards for asset health, maintenance status, and compliance readiness
goPLIMS Modules

ActionR – Maintenance actions, PM tasks, and issue tracking

RFI-M – Structured queries between opera-tions, maintenance, engineering, and QA

DecisionM – Decision logging for maintenance changes, approvals, and risk acceptance

ChangeM / DeviateM – Change control & deviation management for O&M activities

FormM – Digital PM forms, inspection logs, calibration records, and safety checklists

EDccM + E-SignM – Controlled SOPs, maintenance procedures, and digital approvals

TrackR – Live dashboards for asset health, maintenance backlog, and compliance status

PunchM – For equipment issues, NCRs, CAPAs, and field findings

Key Outcomes

Key Metrics

Maintenance Cycle Time

Deviation Close-Out

Documentation Traceability

PM Compliance

Target KPI

Reduced by 20-35%

30-50% Faster

100% audit-ready

>95% on–time execution

To top